Long An province belongs to the southern key economic region, in which Duc Hoa district has a high industrial development and urbanization rate. Accordingly, there is an increase in the demand for electricity in the district.
The Huu Thanh 2 110kV substation and connection line project – Long An province was implemented to meet the load demand and ensure electricity supply in Duc Hoa district.
At the project, Alphanam E&C supplied and installed the whole equipment for the station, including relay setting value calculation, the power-on method setup, operating and troubleshooting, monitoring camera system surveillance, and fire protection.